• THUAN BINH WIND POWER JOINT STOCK COMPANY

      CLEAN ENERGY - FRIENDLY PEOPLE

     

    THUAN BINH WIND POWER JOINT STOCK COMPANY (TBW)

    1. Established date: 10/01/2009;
    2. Head Office: Lac Tri hamlet, Phu Lac commune, Tuy Phong district, Binh Thuan province;
    3. Charter Capital: VND 240 Billion, (USD 12 Million);
    4. TBW ‘s Shareholders:
      • Refrigeration Electrical Engineering Corp. (REE): 50%;
      • DHD Hydropower Company: 20%;
      • Thacmo Hydropower Company: 20%;
      • PECC3 Consultant Company: 10%.

    TBW has executed successfully and put into operation the 24MW Phu Lac wind farm project in September 2016. TBW  is also researching, developing the other wind and solar power projects in Binh Thuan, Ninh Thuan, Gia Lai and Daklak province with a total installed capacity of over 1,000 MW, of which the installed wind power capacity is 510MW and the installed solar power capacity about 570MW.

    Detailed information about TBW ‘s projects:

    No.

    Project Name

    Location

    Total Area (Hectare)

    Expected Capacity of Wind power(MW)

    Expected Capacity of Solar power(MW)

    1

    Phu Lac Project

    Tuy Phong Dist, Binh Thuan

    400

    50

    (Phase 1 24MW

    Phase 2 26MW)

    145

    (Phase 1: 50 MW

    Phase 2 48MW and Phase 3 47 MW)

    2

    Loi Hai Project

    Thuan Bac district, Ninh Thuan province

    523

    30MW

    70

    3

    Vinh Hao Wind Power Project

    Tuy Phong district,

    Binh Thuan province

    572

    60

     

    4

    Ea H’Leo Project

    EaH’Leo district,,

    Đak Lak province

    1,920

    150

    200

    5

    Kong Chro Project

    Kong Chro district,

    Gia Lai province

    3,900

    200

    200

    Total

    7,315

    510

    615

    TOP